METAL FRAME
Do you want to carry out a house construction project with a simple or complex architecture that requires adaptations on the openings, the gables, the vaults or even the curves of your house?
Jupiterevolution has been specialized in metal frame construction for 5 years. Metal frame construction is a revolutionary method that allows you to build sustainably and quickly.
A metal frame is made entirely of light or equivalent steel c-sections (up to 2.0 mm). Fast construction, light weight and great home comfort are some of the benefits of steel construction. With the metal frame you have great architectural freedom. Large ranges are also possible with this construction method.
Metal framing is a dry construction method that combines the advantages of wood framing with steel: light, without deformation, dimensional precision, moisture resistant, earthquake resistant, ... The longevity of the metal structure is equal to or greater than any other traditional construction.
Why a metal frame house kit?
We are suppliers of kits, specifically metal frame houses.
We supply economic and ecological kits.
Our kits are quite complete and serve to build a metal frame construction with roofing and glazing.
Advantages of metal frame house kit:
• Significant savings on price
• Speed of construction
• Infinite customization possibilities
• Possibility of ‘do-it-yourself’ building or assembly by a professional team
• Excellent insulation for passive home
To support those who do not have the necessary technical knowledge for the assembly of the kit we offer the option Kit with technical assistance.
4 options are offered to you:
1. Concrete frame house kit do-it-yourself
(see description above)
2. Concrete frame house kit and assembly carried out by skilled workers
3. Concrete frame house kit and assembly carried out by skilled workers and supply of the second work kit
4. Concrete frame house kit and second work kit with assembly and turnkey delivered house
Excludes batches of earthworks, masonry, roads and service networks.
Fast construction, with possibility of delivery in 4 months, turnkey with our teams.
Make a request for information from your sales advisor.
On the construction site of a house, the work of second work comes after the shell work. These are finishing works, that is to say they do not affect the solidity of the construction but the comfort, the interior and the exterior layout of the house.
Before the second work, a building cannot be inhabited because it is not connected to electricity, not isolated and is not equipped. The second work requires the intervention of various qualified professionals such as plumbers, electricians, veneers, carpenters, tilers, painters in building...
Batch: plaster
Batch: electrical
Batch: plumbing
Batch: sanitary (bath, shower or walk-in, glass wall, taps, toilet)
Batch: heating and ventilation
Batch: tiled floor
Batch: external and internal woodwork
Batch: painting
All these batches are made according to the customer’s choice.
House with metal frame
House T3 of 78 m2 or T4 of 85 m2 in metal frame price from 89930,00 euros (VAT included) for the T3 and 98000,00 euros (VAT included) for the T4 (excluding wallpaper, carpet, paint, excavation and ground adaptation).
Contemporary single storey house in RT 2012 built in 4 months guaranteed by contract, after this 3% discount (excluding bad weather, delays in masonry and technical problems).
Kit (without assembly, without wallpaper, carpet and paint, excavation and ground adaptation).
Price for the kit
T3 56.000,00€ (VAT included)
T4 61.900,00€ (VAT included)
The metal frame kit and assembly which includes the supply and assembly of the following batches:
Metal frame and OSB walls and roof.
- Electrical batch.
- Plumbing batch.
- Rock wool insulation batch.
- Electrical heating batch.
- Tiles and earthenware batch.
- Set of plaster boarded walls and ceilings, sealing and finishing.
- Windows and doors with electric shutters batch.
- Interior joinery batch.
- Controlled mechanical ventilation batch.
- Roof and roof coverings batch.
- Guttering batch.
- Toilet and washbasin batch.
- Sprayed coatings batch.
Excluded batches: roads and service networks, excavation works, masonry and ground adaptation, connection works, preparation, primer and painting, wallpaper and carpet in the rooms.
The kit includes the above batches without assembly.
Commercial, industrial or handcrafted building kit from the Galva® range
The strengths of the product:
Welded built-up structure High Strength Hot Galvanized Steel
Cover in sheet metal 1st choice 5 reinforced waves with a selection of several colors
Draining condensation regulator and roof edges included
FNotched ridge ensuring the waterproofness of the cover
Door frame 6x4,5m (door available as an option)
Possibility of adding siding
Galvanized roof purlin C180mm
Galvanized nesting gutters, exclusive design to prevent corrosion and facilitate installation
Zinc-plated bolts included
Oversized shanks
Kit building of the range Galvafort®, eligible for V2NC1 deployment areas (up to a maximum altitude of 140m corresponding to a low to medium snow-affected area), suitable and ideal for a seafront setting.
Kit Price
The prices indicated are exclusive of taxes and exclude the cost of transport which will be communicated to you by our team of sales experts.
Kit price without assembly:
38.000,00€ (without VAT)